Jul 12, 2016
Click here for our MEP Rack drone flyover! The mechanical scope for this project consists of cutting, capping and making safe both the mechanical and plumbing systems in the Tower. Installation of a return air duct and new cover plates for the medical gas to...
Jul 12, 2016
The scope of this project for Miller Bonded will consist of removing 13 existing RTUs which are no longer in operation; move one new RTU and replace the old RTU unit which is currently located over the Culinarty Classroom. In addition to the relocation of these units...
Jul 12, 2016
Tasks: HVAC Plumbing/Piping Controls Wiring Features Ph I Renovation 4,393 Sq/Ft Demolition 22,354 Sq/Ft Ph II New Construction 24,143 Sq/Ft Demolition 13,239 Sq/Ft Single Story Plan & Spec Liquid Propane Equipment Various Equipment...
May 12, 2015
Tasks • HVAC • Plumbing/Piping • Duct Detailing • Pipe Detailing • BIM Detailing/Coordination • Duct Fabrication • Pipe Pre-Fabrication • Training/Start-up Features • 52,553 Sq/Ft • New...
May 12, 2015
This project will complete an addition to the existing training/board room as well as the addition of a warehouse area. Tasks • HVAC • Plumbing/Piping • Duct Detailing • Pipe Detailing • BIM Detailing/Coordination • Duct Fabrication • Pipe Pre-Fabrication •...