Jul 12, 2016
This project was designed to update both the mechanical and plumbing systems for the Centennial Engineering Building on the UNM Campus. Tasks: HVAC Mechanical Piping HVAC Fabrication BIM Coordination Detailing Features: 12,818 sq/ft Functioning labs connected to...
Jul 12, 2016
This new multi-million dollar hotel in the heart of Old Town consists of 118 rooms. The property will be built adjacent to Hotel Albuquerque at Old Town and will share Hotel Albuquerque’s pool, ballrooms and chapel. The hotel will consist of five levels with...
Jul 12, 2016
Click here for our MEP Rack drone flyover! The mechanical scope for this project consists of cutting, capping and making safe both the mechanical and plumbing systems in the Tower. Installation of a return air duct and new cover plates for the medical gas to...
Jul 12, 2016
The scope of this project for Miller Bonded will consist of removing 13 existing RTUs which are no longer in operation; move one new RTU and replace the old RTU unit which is currently located over the Culinarty Classroom. In addition to the relocation of these units...
Jul 12, 2016
Tasks: HVAC Plumbing/Piping Controls Wiring Features Ph I Renovation 4,393 Sq/Ft Demolition 22,354 Sq/Ft Ph II New Construction 24,143 Sq/Ft Demolition 13,239 Sq/Ft Single Story Plan & Spec Liquid Propane Equipment Various Equipment...