Jul 14, 2016
The project includes refurbishment of existing equipment and ductwork within 11 mechanical penthouses located on the landslide side of the airportās Terminal Building identified as Penthouse Nos. 1 through 8, 9A (East), 98 (West), and 16 (Old Kitchen). The supply air...
Jul 14, 2016
Phase 2 of a 5 phase project, new gymnasium in addition to the new bleachers, locker rooms, basketball court and concession area there will also be a classroom, training room and auxiliary gym. Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM...
Jul 12, 2016
Scope for this project is primarily to disconnect / make-safe theĀ Mechanical & Electrical Systems. Tasks: HVAC Mechanical Piping Electrical Features: Plan & Spec Centurylink function for remaining areas had to remain intact for the duration of demo process...
Jul 12, 2016
This project was designed to update both the mechanical and plumbing systems for the Centennial Engineering Building on the UNM Campus. Tasks: HVAC Mechanical Piping HVAC Fabrication BIM Coordination Detailing Features: 12,818 sq/ft Functioning labs connected to...
Jul 12, 2016
This new multi-million dollar hotel in the heart of Old Town consists of 118 rooms. The property will be built adjacent to Hotel Albuquerque at Old Town and will share Hotel Albuquerque’s pool, ballrooms and chapel. The hotel will consist of five levels with...