Montezuma Combination Courts

Montezuma Combination Courts

Tasks: HVAC Plumbing/Piping Electrical HVAC Fabrication Pipe Fabrication Electrical Fabrication BIM Participation (not MBI lead) Detailing   Features: 28,000 sq/ft Building Type: single-story/partial basement Bid Type: Plan/spec LEED: Gold Penal (tamper proof) fixtures...
Sandia National Labs Building 905

Sandia National Labs Building 905

Construct approximately 15,000 sq. ft. office addition to Building 905 and renovate approximately 9,000 sq. ft. within the lobby and north wing of 905. Tasks: HVAC Plumbing/Piping HVAC Fabrication BIM Coordination Preconstruction Services Detailing Features: 24,000 Sq/Ft Building Type: single story, multi-phase building Three phases: new, renovation & conference room Plan / Spec LEED Gold Buy...
Albuquerque Sunport Penthouse Redesign

Albuquerque Sunport Penthouse Redesign

The project includes refurbishment of existing equipment and ductwork within 11 mechanical penthouses located on the landslide side of the airport’s Terminal Building identified as Penthouse Nos. 1 through 8, 9A (East), 98 (West), and 16 (Old Kitchen). The supply air handlers and return air fans within each penthouse will be modified to include new chilled and hot water coils, the associated piping, fan change out, damper repairs, controls, discharge ducts, etc. The work will be generally limited to the penthouses floor line and above, and will be tested and balanced to meet the CFM demand of the system. The project will include the supporting electrical for the upgrades and the connection of new equipment, structural reinforcement to support the mechanical equipment, and enlargement of existing floor/wall penetrations.   Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Preconstruction Services Detailing Features: 35,070 Sq/Ft Building Type (multi-story, single story) 11 – penthouses on roof of airport Bid Type – competitive lump sum Unique fabrication of large steel pipe & oval...
Cibola County Admin EWP

Cibola County Admin EWP

The scope of this project for Miller Bonded will consist of removing 13 existing RTUs which are no longer in operation; move one new RTU and replace the old RTU unit which is currently located over the Culinarty Classroom. In addition to the relocation of these units the curbs and curb adapters will also be installed. Miller Bonded will replace all roof drain bowls at 6 different location as well as add 1 additional. Tasks: HVAC Plumbing/Piping Electrical Features Single Story Building Plan &...
NMSSUP

NMSSUP

The Nuclear Materials Safeguards and Security Upgrades Project (NMSSUP) Phase II will support management and other current missions carried out in Technical Area (TA)-55 at the Los Alamos National Laboratory (LANL) by providing an effective, robust physical security system. The LANL nuclear missions, as they currently exist and as they are planned in the future, require a reliable safeguards and security system to assure the protection and control of special nuclear materials (SNM), classified matter, and NNSA property. The nuclear materials operation at TA-55 involves the ability to securely store, move, process, and track nuclear materials. The NMSSUP Phase II project plays a key role in the support of this mission by replacing or improving the aging exterior physical security systems and installing enhanced systems to provide support for the TA-55 site. This project includes a secure access tunnel Primary daily access portal for 1500 people and 100 vehicles. Tasks • Site Utilities • HVAC • Plumbing/Piping • Duct Detailing • Pipe Detailing • BIM Detailing/Coordination • Duct Fabrication • Pipe Pre-Fabrication • Training/Start-up Features • 8,295 Sq/Ft • New Construction • Government/Security • Plan & Spec • Los Alamos National Labs TA-55 Site • Perimeter Intrusion Assessment • Vehicle and Pedestrian Entry Control...