Presbyterian Santa Fe Medical Center

, , ,

Miller Bonded installed mechanical and plumbing systems to 72 individual inpatient hospital rooms in this 345,000 square foot diagnostic and treatment facility. We worked closely with the project team during construction to ensure a complete system, despite incomplete project documents and the fast-paced construction schedule. To help minimize additional cost to the Owner, alternate routing and sizes of sewer mains had to be heavily coordinated with the Engineer due to the addition of a 3rd floor, after the underground rough-in was complete. A substantial amount of large pipe and duct systems were pre-fabricated in MBI’s fabrication shops.

Tasks:

  • HVAC
  • Plumbing/Piping
  • HVAC Fabrication
  • Pipe Fabrication
  • BIM Coordination
  • Preconstruction Services
  • Detailing

 

Features:

  • 35,000 Sq/Ft for Shell / 305,000 Sq/Ft for Build-out phase
  • Building Type: Multi-Story Hospital
  • Bid Type: Negotiated
  • Fuel Oil System (7500 gallons of fuel for testing)
  • Includes outpatient clinical services, emergency dept, inpatient beds
Skills

Posted on

September 26, 2018