AT&T AHU-2 & 3

AT&T AHU-2 & 3

Tasks: HVAC HVAC Fabrication Features: TBD Sq/Ft
Presbyterian Santa Fe Medical Center

Presbyterian Santa Fe Medical Center

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Preconstruction Services Detailing   Features: 35,000 Sq/Ft for Shell / 305,000 Sq/Ft for Build-out phase Building Type: Multi-Story Hospital Bid Type: Negotiated Fuel Oil System (7500...
Presbyterian 4B/4C Remodel

Presbyterian 4B/4C Remodel

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing   Features: 14,600 Sq/Ft 453-Bed Acute care hospital Negotiated Contract Work had to be planned around hospital staff / schedule to make sure hospital remained...
Montezuma Combination Courts

Montezuma Combination Courts

Tasks: HVAC Plumbing/Piping Electrical HVAC Fabrication Pipe Fabrication Electrical Fabrication BIM Participation (not MBI lead) Detailing   Features: 28,000 sq/ft Building Type: single-story/partial basement Bid Type: Plan/spec LEED: Gold Penal (tamper proof)...