Southwest Memorial Hospital Patient Wing

Southwest Memorial Hospital Patient Wing

Tasks: Electrical Electrical Fabrication Features: 25,498 New / 2,835 Existing Sq/Ft Building Type: Multi-story hospital Bid Type: Plan & spec    
Presbyterian 4B/4C Remodel

Presbyterian 4B/4C Remodel

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing   Features: 14,600 Sq/Ft 453-Bed Acute care hospital Negotiated Contract Work had to be planned around hospital staff / schedule to make sure hospital remained...
Presbyterian 3B/3C Renovation

Presbyterian 3B/3C Renovation

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing Features: 14,600 Sq/Ft 453-bed acute care hospital Negotiated Contract Hospital remains functional throughout project Mock-up patient room designed so all rooms & subsequent floors will be...
Christus St. Vincent Nursing Unit

Christus St. Vincent Nursing Unit

Click here for our MEP Rack drone flyover! https://youtu.be/aaRIsCcirmU   The mechanical scope for this project consists of cutting, capping and making safe both the mechanical and plumbing systems in the Tower. Installation of a return air duct and new cover plates for the medical gas to aid in refreshing the area. There will be demolition and installation of new natural gas piping. There is also a fuel oil scope included for the Boiler building. Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing Features: 60,000 Sq/Ft New Construction 5,500 Sq/Ft Renovation Area 44,500 Sq/Ft Refurbished Area Multi-story Level III Trauma Center Plan & Spec Fuel Oil Tank System In-house fabrication of roof rack for all...