Christus St. Vincent Nursing Unit

,

Click here for our MEP Rack drone flyover!

https://youtu.be/aaRIsCcirmU

 

The mechanical scope for this project consists of cutting, capping and making safe both the mechanical and plumbing systems in the Tower. Installation of a return air duct and new cover plates for the medical gas to aid in refreshing the area. There will be demolition and installation of new natural gas piping. There is also a fuel oil scope included for the Boiler building.

Tasks:

  • HVAC
  • Plumbing/Piping
  • HVAC Fabrication
  • Pipe Fabrication
  • BIM Coordination
  • Detailing

Features:

  • 60,000 Sq/Ft New Construction
  • 5,500 Sq/Ft Renovation Area
  • 44,500 Sq/Ft Refurbished Area
  • Multi-story
  • Level III Trauma Center
  • Plan & Spec
  • Fuel Oil Tank System
  • In-house fabrication of roof rack for all piping