Presbyterian Farmington Medical Office Building

,

Tasks
• HVAC
• Plumbing/Piping
• Duct Detailing
• Pipe Detailing
• BIM Detailing/Coordination
• Duct Fabrication
• Pipe Pre-Fabrication
• Training/Start-up

Features
• 28,000 Sq/Ft
• New Construction

Skills

Posted on

May 12, 2015