The 25,305 sq. ft. library facility at the intersection of Central and Unser will feature a 23,250 sq. ft. main level and a 2,055 sq. ft. lower level for the advanced mechanical systems. Construction consists of concrete slab on grade, light steel frame, structural brick foundation walls with brick veneer and metal stud exterior walls. Windows and openings will be aluminum and glass storefront and curtain wall. Also included are access flooring with underfloor air distribution, gypsum board partitions, acoustical ceilings and single ply membrane roofing. Site work includes paving and landscaping.
Tasks
• HVAC
• Plumbing/Piping
• Duct Detailing
• Pipe Detailing
• BIM Detailing/Coordination
• Duct Fabrication
• Pipe Pre-Fabrication
• Training/Start-up
Features
• 25,305 Sq/Ft
• New Construction