The scope of this project for Miller Bonded will consist of removing 13 existing RTUs which are no longer in operation; move one new RTU and replace the old RTU unit which is currently located over the Culinarty Classroom. In addition to the relocation of these units the curbs and curb adapters will also be installed. Miller Bonded will replace all roof drain bowls at 6 different location as well as add 1 additional.
Tasks:
- HVAC
- Plumbing/Piping
- Electrical
Features
- Single Story Building
- Plan & Spec