A true team effort, award-winning UNM Centennial Engineering Center was designed to incorporate the multiple disciplines of engineering into one center. The mechanical system incorporated new state-of-the-art equipment as well as tying into UNM’s central plant via piping in the “tunnels”. Miller Bonded served as the lead BIM coordinator, easing the challenges of limited construction space and ensuring that UNM students and staff were always provided with a safe walkway to access existing buildings.
Tasks:
• Project Design/Assist
• HVAC
• Plumbing
• Pipe Fabrication
• Duct Fabrication
• BIM Coordination
Key Features:
• 147,445 square feet
• Four Story Structure
• Laboratory Space
• Classrooms
• Office Space