The project consists of a new tow story addition to an existing elementary school, renovation to the existing administration and Media Center portion of the building. Overall the project consists of approximately 54,000 sq/ft of new construction and 10,000 sq/ft of renovation. A temporary portable classroom campus will need to be built to house students and staff during construction. New site utilities will be installed along with some enhanced storm drainage work to eliminate the discharge water from the existing school into surrounding neighborhood homes.
Tasks
• HVAC
• Plumbing/Piping
• Duct Detailing
• Pipe Detailing
• BIM Detailing/Coordination
• Duct Fabrication
• Pipe Pre-Fabrication
• Training/Start-up
Features
• 54,000 Sq/Ft New Construction
• 10,000 Sq/Ft Renovation
• School
• Plan & Spec