Farmington High School Gym

,

Phase 2 of a 5 phase project, new gymnasium in addition to the new bleachers, locker rooms, basketball court and concession area there will also be a classroom, training room and auxiliary gym.

 

Tasks:

  • HVAC
  • Plumbing/Piping
  • HVAC Fabrication
  • Pipe Fabrication
  • BIM Coordination
  • Preconstruction Services
  • Detailing

Features:

  • 28,500 Sq/Ft
  • Building Type (multi-story, single story) 2-story
  • Bid Type – Competitive Lump Sum
  • Hydrotherapy Tubs
Skills

Posted on

July 14, 2016