This project was designed to update both the mechanical and plumbing systems for the Centennial Engineering Building on the UNM Campus.
Tasks:
- HVAC
- Mechanical Piping
- HVAC Fabrication
- BIM Coordination
- Detailing
Features:
- 12,818 sq/ft
- Functioning labs connected to renovation area – had to remain functional
- Plan & Spec
- Hydrofluoric duct & welded stainless steel duct on project
- LEED project (Silver)
- Very limited lay down area / just in time delivery