Vaughn Elementary School

Vaughn Elementary School

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing Features: 24,610 Sq/Ft Furnace Gas Piping
Presbyterian Santa Fe Medical Center

Presbyterian Santa Fe Medical Center

Miller Bonded installed mechanical and plumbing systems to 72 individual inpatient hospital rooms in this 345,000 square foot diagnostic and treatment facility. We worked closely with the project team during construction to ensure a complete system, despite incomplete...
UNM McKinnon Center for Management

UNM McKinnon Center for Management

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing Features: 45,851 Sq/Ft Building Type: Multi-story Bid Type: Design-Build Assist LEED: Silver Original Construction in...
Presbyterian 4B/4C Remodel

Presbyterian 4B/4C Remodel

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing   Features: 14,600 Sq/Ft 453-Bed Acute care hospital Negotiated Contract Work had to be planned around hospital staff / schedule to make sure hospital remained...
UNM Farris Hall

UNM Farris Hall

Tasks: HVAC Plumbing/Piping HVAC Fabrication Pipe Fabrication BIM Coordination Detailing   Features: 53,191 Sq/Ft Building Type: Multi-Story, Concrete Building Bid Type: Plan/Spec & Design-Build Assist LEED: Silver Combo faucet/soap dispenser/hand dryers in...