APS Navajo Elementary School

, ,

Construction of new 26,992 sq ft 2-story classroom building and renovations of existing 4,902 sq ft classroom areas.

Tasks:

  • HVAC
  • Plumbing/piping
  • HVAC Fabrication
  • BIM participation
  • Detailing
  • Commissioning assistance

Features:

  • Plan & spec bid
  • 2-story building
  • 31,894 sq/ft
  • Exposed duct in corridor
  • VRF heat pump with heat recovery unit system
  • (3) different sizes of water closets (kiddie, regular, and ADA compliant)
  • BIM participation
  • LEED Silver
  • MBI fabricated Filter Boxes
Skills

Posted on

July 16, 2021