Zuni Elementary School

,

The new school consolidates two existing elementary schools into a new building for Pre-K to 5th grade.

Tasks:

  • HVAC
  • Plumbing/Piping
  • HVAC Fabrication
  • Pipe Fabrication
  • BIM Coordination
  • Detailing

Features:

  • 86,269 Sq/Ft
  • Multi-story & single story
  • Bid Type: Plan & Spec
  • Geothermal
  • Radon pits
Skills

Posted on

July 14, 2016