Presbyterian 1C Renovation

Interior demolition and build-out of approximately 10,000 SF of the 1C patient tower and related infrastructure elements.

Tasks
•HVAC
•Plumbing/Piping
•Electrical
•HVAC Fabrication
•Pipe Fabrication
•BIM Coordination
•Preconstruction Services
•Detailing

Features
•10,000 Sq/Ft
•Multi-story (admin area, doctor & nurses locker rooms)
•Negotiated / Plan & Spec / Design-build
•Shaft work (return/supply) using Bosan’s chair & scaffolding inside building
•Tie-in to existing systems while maintaining the hospital’s functionality

Job Details: