Presbyterian 1B Unit & Infrastructure Remodel

This project is a remodel for the Presbyterian hospital with heavy emphasis on upgrading the mechanical systems. There will be replacement of all mechanical, plumbing and med gas systems throughout the supply shafts as well as replacement of the heating and cooling source equipment in sub basement. The final phase of the project will be renovation of Floor 1B.
Tasks
• HVAC
• Plumbing/Piping
• Duct Detailing
• Pipe Detailing
• BIM Detailing/Coordination
• Duct Fabrication
• Pipe Pre-Fabrication
• Training/Start-up

Features
• 10,000 Sq/Ft
• Hospital Remodel

Job Details: