Dam Ranch

This project will result in a 14,000 sq/ft main house, fitness and pool area and 5,000 guest house. The main house will be complete with in-floor radiant heating system, 15 roof top units which will serve as the primary source of cooling and as well as back up heat to the radiant system, low temp AC and humidity control for the wine storage area, as well as the installation of a water conditioning system.
Tasks
• HVAC
• Plumbing/Piping
• Pipe Detailing
• Duct Fabrication
• Training/Start-up

Features
• New Construction
• Residential
• Design Build/Assist
• 19,000 Sq/Ft

Job Details: